Free Pre-Start Checklist (Pump Station) Template
Download our Free Pre-Start Checklist (Pump Station) Template to formalise equipment inspections. This structured DOCX & PDF resource helps improve safety.
Free Pre-Start Checklist (Pump Station) Template
DOCX • 125 KB + PDF
Updated Sep 2026
No signup required

Purpose of the Free Pre-Start Checklist (Pump Station) Template
Using a structured checklist before operating any plant is a fundamental safety practice in Australian workplaces. This Free Pre-Start Checklist (Pump Station) Template provides a formalised way for operators to inspect equipment, identify potential faults, and ensure the pump is safe to use before work commences.
Its primary goal is to prevent incidents by identifying mechanical, electrical, or structural defects before they lead to failure, injury, or environmental harm.
A pre-start check is a crucial control measure, often identified during the development of a Free Water Pump Risk Assessment Template. By methodically checking items like guards, hoses, electrical connections, and fluid levels, operators can catch issues early, preventing costly breakdowns and serious injuries. The completed checklist also provides a documented record that daily inspections have been completed, supporting your organisation's due diligence obligations under WHS law.
Video walkthrough
How to use the Free Pre-Start Checklist (Pump Station) Template
This template is designed as a structured starting point for developing a site-specific checklist. The process is straightforward:
- Download: Get the template in your preferred format (DOCX for easy editing or PDF).
- Customise: Adapt the checklist to the specific make, model, configuration, and operating environment of your pump station. Add, remove, or modify items to ensure all critical components and potential hazards are covered.
- Train: Ensure all operators are trained not only on how to complete the checklist but also on the importance of each item and what constitutes a pass or a fail.
- Implement: Integrate the checklist into your daily operational procedures. Establish a clear process for reporting and addressing any identified faults, including tagging out unsafe equipment.
Note: It is critical that you customise this template for your specific workplace. We provide this document as a starting point, but you must add or remove checks to suit the make, model, and operational context of your pump stations.
Integrating this checklist into your organisation's wider WHS management systems ensures consistency and accountability.
Training is another essential component. Workers must understand not just what to check, but why each item is important.
Regular reinforcement through tools like our Pre-Start Checks and Plant Maintenance Toolbox Talk Template is highly effective in building a strong safety culture around plant and equipment.
When to use it
A pre-start inspection should be conducted at the beginning of every shift or before the pump station is used for the first time each day. It is also essential to perform a full check after any maintenance, servicing, or modification has occurred, or if the equipment has been inactive for an extended period.
The completed checklists serve as valuable records for internal reviews and external WHS compliance auditing, demonstrating a proactive approach to plant safety management.
Who should use it
The pre-start inspection should be carried out by a person who is trained and competent to operate the specific pump station. This is typically the designated operator for the shift.
It's vital that operators not only know how to use the equipment safely but also how to recognise potential defects and the risks they pose. Verifying this knowledge is key; the process can be formalised using documents such as a Verification of Competency (Concrete Pump (Stationary)) Template for similar high-risk plant.
The Role of Supervisors
Supervisors play a key role in the pre-start process. They are responsible for ensuring that operators are completing the checks correctly, reviewing the completed forms, and taking prompt action to address any reported defects.
This oversight ensures the system functions as intended and that unsafe equipment is properly controlled. A pre-start check is more than a paperwork exercise; it is a critical safety function that forms part of a complete safe system of work.
It should be used in conjunction with other key documents; for example, this checklist verifies the equipment's condition, while a FREE Pump SOP (Safe Operating Procedure) Template outlines the steps for using it safely. By embedding these checks into daily operations, your organisation can significantly reduce the risk of plant-related incidents.
Explore our full free WHS resources library for more templates to support your safety framework.
Common mistakes
Common mistakes to avoid
- Failing to customise the generic template to match the specific pump station model and its unique risks.
- "Ticking and flicking" the checklist without physically or visually inspecting the listed items.
- Neglecting to immediately remove faulty equipment from service and apply a "Do Not Operate" or lockout tag.
- Poor record-keeping practices or supervisors failing to review completed checklists and action defects.
Legal references
Legal considerations
The following legal requirements may be relevant to this type of work.
- Work Health and Safety Act (Harmonised) — Provides the primary duties for protecting workers and other people from work health and safety risks.
- Work Health and Safety Regulations (Harmonised) — Sets out requirements supporting the management of workplace hazards and risks.
The following codes may be relevant to this type of work.
- Managing WHS Risks Code of Practice — Provides practical guidance on identifying hazards, assessing risks and applying effective controls.
- Work Health and Safety Consultation, Cooperation and Coordination Code of Practice — Provides practical guidance on consulting workers and coordinating with other duty holders.
- Managing the Work Environment and Facilities Code of Practice — Provides practical guidance on safe work environments, workplace facilities and related controls.
Did you know
Maintenance is Key
According to Safe Work Australia, inadequate maintenance is a contributing factor in a significant number of plant-related incidents. Regular pre-start checks are a critical first step in an effective preventative maintenance program.
Confined Space Risk
Many pump stations are located in or involve confined spaces which pose significant risks. Always ensure a separate risk assessment and entry permit system is in place for any work requiring entry into these hazardous areas.
FAQ
Frequently asked questions
01What's the difference between a pre-start checklist and a risk assessment?
02How often should a pump station pre-start check be done?
03Who is responsible for completing the pre-start checklist?
04Does this template cover all types of pump stations?
Share this resource
Free Pre-Start Checklist (Pump Station) Template
Browse Categories
How To Use It
- 1Download and open in Word or PDF.
- 2Replace the placeholders with your business details.
- 3Get it reviewed by a WHS specialist before rollout.
Need it customised?
Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.
Book a Free Consultation Explore Consultancyor call 1300 156 382