Spire Safety
    Pre-Start Checklists

    Free Pre-Start Checklist (Agitator) Template

    Download our free Pre-Start Checklist (Agitator) Template. This structured Word & PDF document helps formalise safety checks for agitators before use. Download

    September 11, 20264 min read3 viewsLast reviewed September 2026Licensing terms (PDF)

    Free Pre-Start Checklist (Agitator) Template

    DOCX • 125 KB + PDF

    Updated Sep 2026

    No signup required

    Free Pre-Start Checklist (Agitator) Template — document preview

    Purpose of the Free Pre-Start Checklist (Agitator) Template

    Operating heavy plant like a concrete agitator truck introduces significant workplace risks. A structured inspection process is a critical control measure for managing these risks.

    Our Free Pre-Start Checklist (Agitator) Template provides a solid foundation for formalising the daily safety and maintenance checks required before operating the vehicle. Using this Safe Operating Procedure helps identify mechanical faults, safety system failures, or damage that could lead to an incident.

    It promotes a consistent approach to safety, ensuring every operator inspects the agitator to the same standard before each shift.

    This document is designed to be integrated into your broader safety framework. A robust process for managing plant safety not only protects your workers but also forms a key part of your overall WHS management system. Documenting pre-start checks provides a record of due diligence and demonstrates a proactive commitment to meeting your WHS obligations.

    It helps you catch small issues, like a worn hose or a low tyre, before they become major, costly, and dangerous failures on a worksite.

    What is an Agitator Pre-Start Checklist?

    An agitator pre-start checklist is a formal tool used by operators to inspect the equipment before use. It guides the operator through a series of checks covering critical components of the truck and the agitation system, such as brakes, steering, lights, tyres, guards, emergency stops, and the mixing drum.

    The completed checklist serves as a record that the inspection was performed and documents any defects found that require attention.

    Video walkthrough

    How to use the Free Pre-Start Checklist (Agitator) Template

    This template is a starting point aligned with Australian WHS principles. To make it effective, it must be adapted to your specific operational needs and equipment. Download the DOCX file and follow these steps:

    • Customise for Your Plant: Review the checklist against the specific make and model of your agitator truck. Add or remove items to ensure the checklist accurately reflects all critical safety components and functions of your machine.
    • Consult Your Workers: Involve the operators who use the agitators every day. Their hands-on experience is invaluable for identifying practical safety checks and potential failure points that may not be in a generic template. This consultation is a key part of effective risk management.
    • Integrate and Train: Once finalised, integrate the checklist into your daily procedures. Ensure all operators are thoroughly trained on how to conduct the inspection, what each item means, and the process for reporting any identified defects. This process is similar to what's required for other specialised plant, like that covered in our free Boom Pump SOP template.
    • Review and Update: Your Safe Operating Procedure should be a living document. Plan to review it regularly, and always update it after an incident, near miss, or when new equipment or information becomes available.

    Important: We have developed this template as a guide. You must customise it to your specific workplace, equipment, and processes to ensure it is fit for purpose and helps you meet your safety duties.

    When to use this Safe Operating Procedure

    The pre-start checklist should be completed by the operator at the beginning of each shift or before the agitator is used for the first time on any given day. If the plant is used by multiple operators across different shifts within a 24-hour period, a new check should be completed at the start of each operator's shift.

    This ensures a continuous chain of verification for the equipment's safe condition. Just as you would with other heavy machinery outlined in a free Dozer SOP template, consistent daily checks are non-negotiable.

    Who should use it

    This Safe Operating Procedure should be used by any person who is tasked with operating an agitator. The user must be a competent person, meaning they have received the necessary information, instruction, training, and supervision to perform the task safely.

    Supervisors and managers also have a role in ensuring the checks are being completed correctly and that any reported defects are actioned in a timely manner. Periodically, a supervisor should verify the process through observation, which can be a valuable input for WHS compliance auditing activities.

    The principles of operator-led inspections are fundamental to plant safety across the board, whether for agitators or equipment covered in resources like our free Front End Loader SOP template. This library of documents can help you build a consistent safety documentation portfolio, with many more examples available in our free WHS resources library.

    Common mistakes

    Common mistakes to avoid

    • Using a generic checklist without customising it for the specific agitator model and attachments.
    • Operators 'tick and flicking' the form without physically performing the required checks.
    • Failing to have a clear process for reporting, isolating, and rectifying defects found during an inspection.
    • Not reviewing or updating the checklist after an incident or when new equipment is introduced.

    Legal references

    Legal considerations

    The following legal requirements may be relevant to this type of work.

    • Work Health and Safety Act (Harmonised)Provides the primary duties for protecting workers and other people from work health and safety risks.
    • Work Health and Safety Regulations (Harmonised)Sets out requirements supporting the management of workplace hazards and risks.

    The following codes may be relevant to this type of work.

    • Managing WHS Risks Code of PracticeProvides practical guidance on identifying hazards, assessing risks and applying effective controls.
    • Work Health and Safety Consultation, Cooperation and Coordination Code of PracticeProvides practical guidance on consulting workers and coordinating with other duty holders.
    • Managing the Work Environment and Facilities Code of PracticeProvides practical guidance on safe work environments, workplace facilities and related controls.

    Did you know

    Centre of Gravity

    On concrete agitators, unchecked concrete buildup ('dags') inside the drum can alter the vehicle's centre of gravity, significantly increasing the risk of a rollover, especially on uneven ground or corners.

    Leading Cause of Failure

    Mechanical failures are a leading cause of incidents involving mobile plant. Thorough pre-start checks can identify many common issues like hydraulic leaks, tyre damage, or brake faults before they lead to an accident.

    FAQ

    Frequently asked questions

    01What is the difference between a pre-start checklist and a Safe Operating Procedure (SOP)?
    A pre-start checklist is a specific tool used to verify equipment condition before use. A full SOP is a broader document detailing the step-by-step instructions for the entire task, which includes performing the pre-start check as one of its key steps.
    02Is this agitator checklist suitable for all types of agitators?
    This template provides a general framework for common agitator trucks. You must customise it for the specific make, model, and configuration of your plant to ensure all relevant safety features and risks are covered.
    03How often should agitator pre-start checks be completed?
    Pre-start checks should be completed by the operator before the start of every shift or before using the equipment for the first time each day. This ensures faults are identified before the plant is operated.
    04Who is responsible for ensuring pre-start checks are completed correctly?
    The operator is responsible for physically conducting the check. Supervisors and managers are responsible for implementing the system, training workers, and ensuring that any defects found are properly reported and rectified.

    Share this resource

    How To Use It

    1. 1Download and open in Word or PDF.
    2. 2Replace the placeholders with your business details.
    3. 3Get it reviewed by a WHS specialist before rollout.
    Get a document review

    Need it customised?

    Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.

    Book a Free Consultation Explore Consultancy

    or call 1300 156 382