Inspection & Test Plans

    Free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template

    Download our free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template to formalise quality and safety checks for your construction projects.

    September 16, 20264 min read17 viewsLast reviewed September 2026Licensing terms (PDF)

    Free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template

    DOCX • 137 KB + PDF

    Updated Oct 2026

    No signup required

    Free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template — document preview

    Purpose of the Free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template

    Laying a concrete subfloor ground slab is a critical-path activity in construction that demands rigorous quality control. This free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template provides a structured framework for documenting and verifying every stage of the process.

    An ITP is a quality assurance document that outlines the sequence of inspections, tests, and verifications required to ensure the final slab meets all project specifications, engineering standards, and safety requirements. Using a formal plan helps prevent costly rework, ensures structural integrity, and demonstrates due diligence.

    It forms a key component of a project's overall WHS management system, linking practical site activities to documented quality outcomes.

    Video walkthrough

    How to use the Free Inspection & Test Plan (Concrete Subfloor Ground Slab) Template

    This template is designed as a comprehensive starting point. It details typical activities involved in ground slab construction, from initial ground preparation to final curing and finishing.

    You will find columns for identifying inspection types (such as hold points, witness points, and surveillance), acceptance criteria, responsible personnel, and records to be kept. Thorough documentation is essential for traceability and can be invaluable during a formal WHS compliance audit.

    Important: This is a template only. We are not WHS consultants for your specific business.

    You MUST customise this document to suit the unique requirements of your project, site conditions, engineering specifications, relevant Australian Standards (like AS 3600 and AS 2870), and organisational procedures. It is your responsibility to ensure the final document is fit for purpose.

    When to use it

    An ITP for a concrete subfloor ground slab should be developed and implemented before any physical work begins. It serves as a roadmap throughout the construction phase, guiding teams at key milestones.

    Its use is essential during pre-pour preparations, such as checking excavation levels, sub-base compaction, formwork, and reinforcement placement. During the pour, it guides checks on concrete supply, slump testing, and placement techniques.

    Post-pour, it outlines requirements for finishing, curing, and strength testing, ensuring the slab achieves its specified performance.

    Key Stages in a Concrete Slab ITP

    A comprehensive plan breaks the process into manageable stages, each with its own set of checks and balances.

    Pre-Pour Stage

    This is the most critical phase for inspection, as errors are difficult and expensive to fix once concrete is poured. Key checks include:

    • Verifying survey set-out and excavation levels.
    • Confirming subgrade preparation and compaction test results.
    • Inspecting the damp-proof membrane for integrity and correct lapping.
    • Checking formwork for stability, dimensions, and correct levels.
    • Inspecting steel reinforcement for size, spacing, cover, and cleanliness.
    • Ensuring all service penetrations and blockouts are correctly positioned and secured.

    The materials used, such as aggregates and cement, must also meet specifications. Understanding requirements for sourcing these materials can be complex, particularly in larger operations that may need to consider state-specific regulations like those outlined in Principal Mining Hazard Management Plans: A Guide.

    During the Pour

    Coordination is key during the pour. Inspections and tests focus on the properties and handling of the fresh concrete. This includes:

    • Confirming concrete mix details against the approved specification on delivery dockets.
    • Conducting slump tests to verify workability.
    • Taking samples for compressive strength testing (cylinders or cubes).
    • Monitoring placement and compaction techniques (e.g., vibration).
    • Ensuring the correct operation of equipment like concrete pumps; this includes checking that operators are competent, which can be formalised using documents like our Verification of Competency (Concrete Pump (Stationary)) Template.

    Post-Pour Stage

    After placement, the focus shifts to ensuring the concrete develops its intended strength and durability. Checks include:

    • Verifying finishing is performed to the specified standard (e.g., trowel finish, broom finish).
    • Confirming that curing methods (e.g., water, curing compounds) are applied correctly and for the required duration.
    • Monitoring for and addressing any plastic shrinkage cracking.
    • Stripping formwork after the concrete has reached sufficient strength.
    • Reviewing compressive strength test results against the specified 28-day strength.

    Who should use it

    This Inspection & Test Plan template is intended for use by a range of personnel involved in construction and quality management. Project Managers use it for overall project control and scheduling.

    Site Engineers and Supervisors use it to manage day-to-day quality checks and supports your compliance efforts with specifications. Quality Assurance/Quality Control (QA/QC) Managers use it to audit the process and maintain project records.

    Forepersons and lead tradespeople use it to understand the specific requirements and hold points for their work. For organisations needing support in establishing these robust processes, engaging external WHS consulting services can provide valuable expertise and oversight.

    Common mistakes

    Common mistakes to avoid

    • Failing to customise the template for specific project engineering and site conditions.
    • Skipping 'hold point' inspections due to schedule pressure, leading to non-compliant work being covered up.
    • Inadequate record-keeping, making it impossible to prove that checks were completed correctly.
    • Not briefing the entire site team, including subcontractors, on the ITP requirements and their specific responsibilities.

    Legal references

    Legal considerations

    The following legal requirements may be relevant to this type of work.

    • Work Health and Safety Act (Harmonised) — Provides the primary duties for protecting workers and other people from work health and safety risks.
    • Work Health and Safety Regulations (Harmonised) — Sets out requirements supporting the management of workplace hazards and risks.

    The following codes may be relevant to this type of work.

    • Managing WHS Risks Code of Practice — Provides practical guidance on identifying hazards, assessing risks and applying effective controls.
    • Work Health and Safety Consultation, Cooperation and Coordination Code of Practice — Provides practical guidance on consulting workers and coordinating with other duty holders.
    • Managing the Work Environment and Facilities Code of Practice — Provides practical guidance on safe work environments, workplace facilities and related controls.

    Did you know

    Cylinder Testing

    Concrete strength is typically tested by taking samples during the pour and casting them into cylinders. These cylinders are then cured and crushed at specific intervals (e.g., 7 and 28 days) to verify the concrete meets its specified compressive strength.

    Curing is Crucial

    Improper or insufficient curing can reduce the final strength of concrete by up to 50%. Curing is the process of maintaining moisture and temperature in the concrete to ensure proper hydration of the cement.

    FAQ

    Frequently asked questions

    01What is a 'hold point' in a concrete slab Inspection & Test Plan?
    A 'hold point' is a mandatory verification step in the process. Work cannot proceed beyond a hold point without the required inspection and formal approval from the designated person (e.g., site engineer or third-party inspector).
    02Does this ITP template cover reinforcement and formwork inspections?
    Yes, the template includes detailed sections for pre-pour checks, which specifically cover the inspection of formwork, steel reinforcement placement, size, and cover before any concrete is poured.
    03Is an Inspection & Test Plan a legal requirement for concrete works in Australia?
    While the ITP document itself may not be explicitly named in WHS law, the duties to ensure quality, safety, and compliance with codes and standards (like the National Construction Code and Australian Standards) are legal requirements. An ITP is a widely recognised best-practice method for demonstrating and achieving this compliance.
    04How do I determine the acceptance criteria for my ITP?
    Acceptance criteria are derived from the project's technical specifications, structural engineering drawings, relevant Australian Standards (e.g., AS 3600 for Concrete Structures, AS 2870 for Residential Slabs and Footings), and the National Construction Code (NCC).

    Share this resource

    How To Use It

    1. 1Download and open in Word or PDF.
    2. 2Replace the placeholders with your business details.
    3. 3Get it reviewed by a WHS specialist before rollout.
    Get a document review

    Need it customised?

    Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.

    Book a Free Consultation WHS consulting services

    or call 1300 156 382

    Browse all inspection & test plans A–Z