Pre-Start Checklists

    Free Pre-Start Checklist (Granulator) Template

    Download our Free Pre-Start Checklist (Granulator) Template. This DOCX & PDF resource helps formalise safety checks for granulating machinery. Get started.

    September 12, 20263 min read3 viewsLast reviewed September 2026Licensing terms (PDF)

    Free Pre-Start Checklist (Granulator) Template

    DOCX • 125 KB + PDF

    Updated Sep 2026

    No signup required

    Free Pre-Start Checklist (Granulator) Template — document preview

    Purpose of the Free Pre-Start Checklist (Granulator) Template

    Granulators are powerful machines used for size reduction of materials, often plastics, and present significant workplace hazards. A systematic pre-start inspection is a critical control measure to ensure the machine is safe to operate.

    This Free Pre-Start Checklist (Granulator) Template provides a structured starting point for organisations to formalise their daily or pre-shift equipment inspections. Using this checklist helps identify potential faults, damage, or wear and tear before they escalate into dangerous situations, protecting operators and ensuring the mechanical integrity of the asset.

    Integrating regular, documented checks into your daily operations is a fundamental component of proactive safety management. It demonstrates due diligence and provides a clear record of equipment condition over time.

    This practice is a cornerstone of effective WHS management systems, helping to systematically reduce risk and improve overall site safety. This template is designed to align with Australian WHS principles for plant and equipment safety.

    Video walkthrough

    How to use the Free Pre-Start Checklist (Granulator) Template

    This template is provided in both DOCX and PDF formats for your convenience. The DOCX version is fully editable, allowing you to add, remove, or modify checklist items to suit the specific model and configuration of your granulator.

    It is crucial to tailor the document to your operational context, including specific safety features, site rules, and manufacturer recommendations.

    Note: This document is a template only. You must customise it to reflect the specific hazards and control measures relevant to your workplace, machinery, and operational procedures. We are not responsible for your safety outcomes, and use of this template does not guarantee WHS compliance.

    You should conduct a risk assessment to ensure all relevant checks are included.

    The general process of pre-operational checks is a vital topic for safety discussions; you can use our Pre-Start Checks and Plant Maintenance Toolbox Talk to reinforce training with your team. This helps ensure everyone understands the 'why' behind the checklist, not just the 'what'.

    When to use it

    A granulator pre-start checklist should be completed before the first use of the machine on any given day or shift. This ensures that the equipment's condition is verified before it is energised and put into production.

    It should also be used after any significant maintenance, repair, or when the machine is relocated. Establishing a routine where the check is non-negotiable before operation is key to building a strong safety culture and preventing incidents related to equipment failure.

    Who should use it

    This checklist should be completed by a competent person who has been trained and authorised to operate the specific granulator. This is typically the machine operator assigned to the equipment for that shift.

    Supervisors and managers also have a role; they are responsible for ensuring the checks are being completed correctly and that any reported issues are addressed promptly. Periodically reviewing completed checklists is a good practice for supervisors during safety walks or as part of a formal WHS compliance auditing program.

    Additional Considerations

    Beyond the checklist, ensure a safe system of work is in place for tasks like blade changes, unblocking, and cleaning, which often require robust lock-out tag-out (LOTO) procedures. The principles of machine safety checks are universal, whether for a granulator or other complex machinery like a CNC machine, as seen in our Free Pre-Start Checklist (CNC Router) Template. Each piece of equipment requires its own specific considerations.

    While this resource focuses on granulators, similar structured checks are vital for other industrial equipment. For instance, processes involving mixing or blending would benefit from a resource like our Free Pre-Start Checklist (Agitator) Template. You can explore our entire free WHS resources library for more templates to support your safety management system.

    Common mistakes

    Common mistakes to avoid

    • Failing to customise the generic template for the specific granulator model.
    • Operators 'pencil-whipping' the checklist without physically verifying each item.
    • Not immediately taking the machine out of service and reporting faults found during the check.
    • Neglecting to provide operators with adequate training on how to perform the inspection correctly and what to look for.

    Legal references

    Legal considerations

    The following legal requirements may be relevant to this type of work.

    • Work Health and Safety Act (Harmonised) — Provides the primary duties for protecting workers and other people from work health and safety risks.
    • Work Health and Safety Regulations (Harmonised) — Sets out requirements supporting the management of workplace hazards and risks.

    The following codes may be relevant to this type of work.

    • Managing WHS Risks Code of Practice — Provides practical guidance on identifying hazards, assessing risks and applying effective controls.
    • Work Health and Safety Consultation, Cooperation and Coordination Code of Practice — Provides practical guidance on consulting workers and coordinating with other duty holders.
    • Managing the Work Environment and Facilities Code of Practice — Provides practical guidance on safe work environments, workplace facilities and related controls.

    Did you know

    Entanglement Hazard

    The rotating knives inside a granulator can operate at extremely high speeds, making entanglement one of the most severe hazards. A robust lock-out tag-out procedure is non-negotiable for any task involving access to the cutting chamber.

    Noise Levels

    Granulators can produce noise levels well above the 85 dB(A) exposure standard, requiring hearing protection and potentially other noise control measures like acoustic enclosures.

    FAQ

    Frequently asked questions

    01What is a granulator pre-start checklist?
    A granulator pre-start checklist is a formal document used to guide an operator through a systematic inspection of a granulator machine before it is used. It helps to verify that all safety guards, emergency stops, and operational components are in place and functioning correctly.
    02Why are pre-start checks for granulators important?
    They are crucial for preventing accidents by identifying hazards like damaged guards, worn components, or disabled safety features before operation begins. Regular checks also contribute to preventative maintenance, reducing downtime and extending the life of the equipment.
    03How often should a granulator pre-start check be done?
    A pre-start check should be conducted at the beginning of every shift or day that the granulator is intended to be used. It should also be performed after any maintenance, repairs, or modifications to the machine.
    04Can this template be used for any type of granulator?
    This template is a general starting point. It must be customised to suit the specific make, model, and configuration of your granulator, as safety features and operational checks can vary significantly between different machines.

    Share this resource

    How To Use It

    1. 1Download and open in Word or PDF.
    2. 2Replace the placeholders with your business details.
    3. 3Get it reviewed by a WHS specialist before rollout.
    Get a document review

    Need it customised?

    Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.

    Book a Free Consultation Explore Consultancy

    or call 1300 156 382