Safe Work Method Statement (Float or Low Loader Operation) Template
Download our free Safe Work Method Statement (SWMS) template for float or low loader operations, aligned with Australian WHS practice.
Safe Work Method Statement (Float or Low Loader Operation) Template
DOCX • 161 KB + PDF
Updated Oct 2026
No signup required

Purpose of the Safe Work Method Statement (Float or Low Loader Operation) Template
This free Safe Work Method Statement (SWMS) template for float or low loader operation provides a structured framework for identifying hazards and controlling risks associated with these complex tasks. Float and low loader operations involve significant risks, including vehicle rollovers, uncontrolled movement of plant, load shifting, and potential for contact with overhead or underground services.
This template helps organisations document their hazard identification, risk assessment, and control measures in a clear, systematic manner, promoting a safer working environment for all personnel involved. It assists in planning work safely by ensuring critical safety steps are recognised and acted upon before and during operations.
Spire Safety is committed to providing practical tools that support workplace health and safety across Australia. This SWMS is designed to be a fundamental component of your WHS documentation, aiding in the proactive management of workplace risks.
It helps ensure that all aspects of float and low loader operations, from planning and loading to transport and unloading, are conducted with safety as the primary consideration.
Video walkthrough
How to use the Safe Work Method Statement (Float or Low Loader Operation) Template
Our Safe Work Method Statement (Float or Low Loader Operation) template is provided in an editable DOCX format, making it easy to customise to your specific operational needs. To use this template effectively, download the document and populate it with details relevant to your specific worksite, equipment, and personnel. You MUST customise this template to your workplace's unique risks, equipment, and procedures. This involves:
- Identifying all specific tasks involved in your float or low loader operation.
- Conducting a thorough risk assessment for each task, considering potential hazards like uneven terrain, environmental conditions, other traffic, and equipment malfunctions.
- Defining clear control measures to eliminate or minimise identified risks, prioritising the hierarchy of controls (elimination, substitution, engineering, administrative, PPE).
- Ensuring all workers involved in the operation are consulted, trained, and understand the SWMS before commencing work.
- Regularly reviewing and updating the SWMS to reflect any changes in work processes, equipment, or site conditions.
Remember, a generic SWMS is only a starting point; its effectiveness relies on its accurate adaptation and implementation within your specific operational context. This template aligns with Australian WHS practice for managing high-risk construction work where floats or low loaders are used.
When to use it
This Safe Work Method Statement template should be used whenever a float or low loader is employed for tasks classified as 'high-risk construction work' or other high-risk operations. This includes, but is not limited to, transporting large plant and equipment, oversized loads, or performing tasks in complex environments such as construction sites, public roads, or challenging terrain.
It should be developed and reviewed before any such operation commences, and especially when there are changes to the work environment, equipment, or personnel involved.
Who should use it
This template is invaluable for a range of roles and organisations, including:
- Employers and PCBUs: To meet WHS obligations regarding the planning and documentation of high-risk activities.
- Safety Managers and Officers: For developing, implementing, and maintaining WHS documentation.
- Project Managers and Supervisors: To ensure safe work practices are communicated and followed on site.
- Workers and Operators: As a clear guide for understanding hazards and control measures relevant to their tasks.
- Contractors: To demonstrate a commitment to safety and provide a basis for their own WHS processes.
Organisations looking to enhance their overall safety framework may also consider WHS management systems or pursue ISO 45001 consulting for a more integrated approach to occupational health and safety.
Additional Resources
For more support with your WHS obligations, explore our free WHS resources library or contact us to discuss WHS consulting services tailored to your business needs.
Common mistakes
Common mistakes to avoid
- Using a generic SWMS without customising it to the specific site and task.
- Failing to review and update the SWMS when conditions or tasks change.
- Not properly consulting with workers who will be performing the tasks described in the SWMS.
- Treating the SWMS as a 'tick-box' exercise rather than a living document to genuinely manage risk.
Legal references
Legal considerations
The following legal requirements may be relevant to this type of work.
- Work Health and Safety Act (Harmonised) — Provides the primary duties for protecting workers and other people from work health and safety risks.
- Work Health and Safety Regulations (Harmonised) — Sets out requirements supporting the management of workplace hazards and risks.
The following codes may be relevant to this type of work.
- Managing WHS Risks Code of Practice — Provides practical guidance on identifying hazards, assessing risks and applying effective controls.
- Work Health and Safety Consultation, Cooperation and Coordination Code of Practice — Provides practical guidance on consulting workers and coordinating with other duty holders.
- Managing the Work Environment and Facilities Code of Practice — Provides practical guidance on safe work environments, workplace facilities and related controls.
Did you know
Hierarchy of Controls
The WHS framework requires risks to be managed using a 'hierarchy of controls', starting with eliminating the hazard entirely, then substituting, engineering controls, administrative controls, and finally, personal protective equipment (PPE).
Load Dimensions and Permits
Transporting oversized or overweight loads with floats or low loaders often requires special permits and adherence to specific route planning and escort requirements, depending on state and territory regulations.
FAQ
Frequently asked questions
01What is a Safe Work Method Statement (SWMS) for float or low loader operation?
02Is a SWMS legally required for float or low loader operations in Australia?
03Who is responsible for preparing and implementing the Float or Low Loader Operation SWMS?
04How often should a Safe Work Method Statement be reviewed?
Share this resource
Safe Work Method Statement (Float or Low Loader Operation) Template
Browse Categories
How To Use It
- 1Download and open in Word or PDF.
- 2Replace the placeholders with your business details.
- 3Get it reviewed by a WHS specialist before rollout.
Need it customised?
Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.
Book a Free Consultation WHS consulting servicesor call 1300 156 382
Related templates
- Safe Work Method Statement (Fuel Truck Operation) Template
- Safe Work Method Statement (Light Vehicle Operation) Template
- Safe Work Method Statement (Mobile Crane Operation) Template
- Safe Work Method Statement (Motor Grader Operation) Template
- Safe Work Method Statement (Multi-Tyre Roller Operation) Template
- Safe Work Method Statement (Padfoot Roller Operation) Template
