Spire Safety
    Pre-Start Checklists

    Free Pre-Start Checklist (Auger Attachment) Template

    Download our free Pre-Start Checklist (Auger Attachment) template. A structured starting point for ensuring auger attachments are safe before use. Get your DOCX.

    September 11, 20265 min read3 viewsLast reviewed September 2026Licensing terms (PDF)

    Free Pre-Start Checklist (Auger Attach) Template

    DOCX • 125 KB + PDF

    Updated Sep 2026

    No signup required

    Free Pre-Start Checklist (Auger Attach) Template — document preview

    Purpose of the Free Pre-Start Checklist (Auger Attachment) Template

    A systematic pre-start inspection is a critical safety control for any high-risk plant, including auger attachments used on excavators, skid steers, and other host machinery. This free Pre-Start Checklist (Auger Attachment) Template provides a structured starting point for Australian businesses to develop a procedure for verifying that equipment is safe and ready for operation.

    Using a checklist helps formalise and record inspections, ensuring a consistent approach to identifying potential defects before they lead to incidents.

    The primary goal of this Safe Operating Procedure is to help operators identify and report faults such as hydraulic leaks, structural cracks, worn cutting edges, damaged guards, or insecure mounting pins. By catching these issues early, organisations can prevent equipment failure, reduce the risk of injury to workers and others, and avoid costly unplanned downtime and repairs.

    This template is designed to be adapted to form part of a comprehensive safe system of work.

    Video walkthrough

    How to use the Free Pre-Start Checklist (Auger Attachment) Template

    Download the template in your preferred format (DOCX for easy editing or PDF). The checklist is a starting point aligned with Australian WHS principles and should not be used as-is without careful consideration of your specific operational context.

    It is crucial to review and modify the checklist to reflect the unique hazards of your workplace.

    It is crucial to understand that this template is a guide only. You must customise this document to suit the specific makes and models of auger attachments and host machines used in your workplace, your site conditions, and your operational risks.

    We recommend consulting with operators and maintenance staff during this process. For example, the checks required for an auger on a small skid steer will differ from those on a large excavator, which is covered in our FREE Front End Loader SOP.

    Once customised, the checklist should be integrated into your daily operational procedures. This process of customisation and integration is a fundamental part of building robust WHS management systems that effectively manage risk on site.

    When to use this checklist

    A pre-start inspection of the auger attachment should be conducted before each shift or before the first use of the day. This ensures that the equipment's condition has not changed overnight and is safe for the upcoming work.

    The checklist should be completed by the operator and, depending on company procedure, signed off by a supervisor.

    Additional checks should also be performed:

    • After scheduled maintenance or repairs to verify the work has been completed correctly.
    • If the equipment has been involved in an incident or has been operated outside its normal parameters.
    • When the attachment is being fitted to a new or different piece of host machinery.

    Who should use this checklist

    This checklist should be used by workers who are trained, competent, and authorised to operate the specific host machine and auger attachment. Competency should include a thorough understanding of the equipment's mechanics, potential failure points, and the specific inspection process outlined in the checklist.

    It's not just about ticking boxes; it's about understanding what is being checked and why.

    Supervisors and managers also have a role. They are responsible for ensuring operators are trained, that the checks are being completed diligently, and that any reported defects are actioned promptly.

    Failure to address reported issues undermines the entire safety process. This principle applies to all heavy machinery, including equipment detailed in resources like our FREE Scraper SOP.

    Key inspection points for auger attachments

    While your customised checklist will be specific, it should generally cover several key areas. These include a visual inspection of the auger flighting for cracks or excessive wear, checking the condition of teeth or cutting heads, and ensuring all pins, clips, and fasteners are secure and in good condition. The process is similar to inspecting other powerful rotating tools, a topic also covered in our FREE Hammer Drill SOP.

    Hydraulic systems are another critical area. Operators should check all hoses and couplings for leaks, abrasion, or damage.

    The mounting plate or hitch that connects the auger to the host machine must be inspected for cracks or distortion, and the locking mechanism must be verified to be fully engaged and functional.

    Integrating checklists into your safety system

    Simply having a checklist is not enough. It must be a living document within a functional safety system.

    This involves training workers on its use, establishing clear procedures for reporting and rectifying defects, and periodically reviewing the checklist itself to ensure it remains relevant.

    Management should periodically review completed checklists to identify recurring issues or patterns of damage, which could indicate a larger problem with maintenance schedules, operator behaviour, or equipment suitability for the task. This review process is a core component of continuous improvement and can be formalised through periodic WHS compliance auditing.

    This document is just one of many templates we offer. You can explore our complete free WHS resources library for a wide range of checklists, SOPs, and policies to help build out your safety management system.

    Common mistakes

    Common mistakes to avoid

    • Failing to customise the generic template for the specific auger model and host machine.
    • 'Pencil-whipping' the checklist without physically inspecting each item.
    • Neglecting to remove the equipment from service after a critical fault is identified.
    • Lack of training for operators on what they are looking for during the inspection.

    Legal references

    Legal considerations

    The following legal requirements may be relevant to this type of work.

    • Work Health and Safety Act (Harmonised)Provides the primary duties for protecting workers and other people from work health and safety risks.
    • Work Health and Safety Regulations (Harmonised)Sets out requirements supporting the management of workplace hazards and risks.

    The following codes may be relevant to this type of work.

    • Managing WHS Risks Code of PracticeProvides practical guidance on identifying hazards, assessing risks and applying effective controls.
    • Work Health and Safety Consultation, Cooperation and Coordination Code of PracticeProvides practical guidance on consulting workers and coordinating with other duty holders.
    • Managing the Work Environment and Facilities Code of PracticeProvides practical guidance on safe work environments, workplace facilities and related controls.

    Did you know

    Rotational Force

    The torque generated by a hydraulic auger can be immense, easily capable of catching on underground obstructions like rocks or roots and causing violent, uncontrolled movement of the host machine if not operated correctly.

    Attachment Incidents

    Safe Work Australia data consistently shows that incidents involving attachments are a significant cause of serious injuries, often due to incorrect fitting, mechanical failure, or operator error during connection/disconnection.

    FAQ

    Frequently asked questions

    01What should be included in an auger attachment pre-start checklist?
    A comprehensive checklist should cover the auger flighting, cutting teeth/head, mounting pins and clips, hydraulic hoses and couplings, the gearbox for leaks, and the connection point to the host machine. You must customise it for your specific equipment model and site risks.
    02How often should an auger pre-start check be conducted?
    A pre-start check must be performed before the start of every shift or before the first use of the day. It should also be done after any maintenance, if an incident has occurred, or when attaching it to a different host machine.
    03Is this template sufficient for WHS compliance in Australia?
    This template is a starting point aligned with Australian WHS practices but does not supports your compliance efforts on its own. Compliance is achieved by customising the document for your specific equipment and workplace, integrating it into a safe system of work, and ensuring it is used effectively by competent personnel.
    04Who is responsible for conducting the pre-start check on an auger?
    The trained and competent operator of the machinery is typically responsible for conducting the pre-start check. Supervisors are responsible for ensuring the checks are completed correctly and that any identified faults are addressed before use.

    Share this resource

    How To Use It

    1. 1Download and open in Word or PDF.
    2. 2Replace the placeholders with your business details.
    3. 3Get it reviewed by a WHS specialist before rollout.
    Get a document review

    Need it customised?

    Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.

    Book a Free Consultation Explore Consultancy

    or call 1300 156 382