Free Pre-Start Checklist (Loader) Template
Download our free Pre-Start Checklist (Loader) Template. This structured document helps formalise daily safety inspections and manage WHS risks. Get yours.
Free Pre-Start Checklist (Loader) Template
DOCX • 125 KB + PDF
Updated Sep 2026
No signup required

Purpose of the Free Pre-Start Checklist (Loader) Template
Using a loader, whether it's a front-end, skid-steer, or compact utility loader, involves significant WHS risks. Our free Pre-Start Checklist (Loader) Template provides a structured framework for operators to conduct thorough pre-operational inspections.
Systematically checking the machine before each use is a critical control measure that helps identify mechanical faults, fluid leaks, or safety system failures before they can cause an incident. This documented process not only enhances operator safety but also assists your organisation in demonstrating due diligence and maintaining a safe plant register.
It is designed to be a practical tool aligned with Australian WHS principles for managing risks associated with mobile plant.
Video walkthrough
How to use the Free Pre-Start Checklist (Loader) Template
This resource is available as a DOCX file for easy customisation and a PDF for straightforward printing. The first step is to adapt the checklist to your specific operational needs.
Operators should be trained on how to complete the checklist correctly, what each item means, and the procedure to follow if a defect is found. The process should be integrated into your daily workflow, becoming a non-negotiable step before any loader operation begins.
An effective pre-start process is a key component of broader WHS management systems, linking daily tasks to organisational safety objectives.
It's crucial to understand that this template is a starting point. You must customise it to reflect the specific make and model of your loader(s), the tasks they perform, your site conditions, and your organisation’s specific safety procedures.
We have not accounted for your unique operational context.
When to use a Loader Pre-Start Checklist
A loader pre-start inspection should be carried out at the beginning of every shift or before the machine is used for the first time each day. It is a proactive safety measure, not a reactive one.
If a loader is used by multiple operators across different shifts, a new checklist should be completed by each new operator before they commence work. If an operator finds a fault during the check, they must not use the equipment.
The loader should be isolated, tagged out of service, and the issue reported immediately to a supervisor or maintenance personnel according to your site's procedures. This consistent routine is similar to how you might use a pre-start checklist for a bin lifter or other mobile plant.
Who should use the Pre-Start Checklist
The primary user of this checklist is the trained, licensed, and competent operator of the loader. They have the hands-on responsibility for ensuring the machine is safe to use before they start work.
However, the document serves several other roles within an organisation. Supervisors should periodically review completed checklists to supports your compliance efforts and identify recurring issues.
Maintenance teams use the reports of defects to schedule repairs and servicing. WHS managers or safety officers may use the records as part of workplace inspections, incident investigations, and regular WHS compliance auditing.
Key Inspection Areas
A thorough pre-start check for a loader covers multiple systems. While our template provides a comprehensive list, key areas always include:
- General Visual Check: A walk-around inspection looking for obvious damage, structural cracks, fluid leaks on the ground, and overall cleanliness.
- Cabin & Controls: Checking the integrity of the Roll-Over Protective Structure (ROPS) and Falling-Object Protective Structure (FOPS), seat and seatbelt condition, visibility through windows, and function of all controls, gauges, and warning lights.
- Fluids & Engine: Verifying levels for engine oil, hydraulic fluid, coolant, and fuel. Note any signs of leaks in hoses or around fittings.
- Wheels & Tyres: Inspecting for correct inflation, significant cuts or damage, and secure wheel nuts.
- Safety Systems: Testing the horn, reverse alarm, lights (headlights, indicators, warning beacons), and emergency stop functions.
- Attachments: Ensuring the bucket, forks, or other attachments are securely attached, free from damage, and that all hydraulic rams and hoses are in good condition. The checks required for a bucket will be different from the pre-start checks for floor saws or other specialised equipment.
By formalising this process with a checklist, you create a consistent, repeatable safety habit that significantly reduces the risk of equipment failure and potential harm. For more tools to support your safety program, explore our complete free WHS resources library.
Common mistakes
Common mistakes to avoid
- Operator 'pencil-whipping' the form without physically performing the checks.
- Using a generic, one-size-fits-all checklist that doesn't cover model-specific features or attachments.
- Failing to report minor defects that can escalate into major failures.
- Poor record-keeping and no follow-up process for actioning reported defects.
Legal references
Legal considerations
The following legal requirements may be relevant to this type of work.
- Work Health and Safety Act (Harmonised) — Provides the primary duties for protecting workers and other people from work health and safety risks.
- Work Health and Safety Regulations (Harmonised) — Sets out requirements supporting the management of workplace hazards and risks.
The following codes may be relevant to this type of work.
- Managing WHS Risks Code of Practice — Provides practical guidance on identifying hazards, assessing risks and applying effective controls.
- Work Health and Safety Consultation, Cooperation and Coordination Code of Practice — Provides practical guidance on consulting workers and coordinating with other duty holders.
- Managing the Work Environment and Facilities Code of Practice — Provides practical guidance on safe work environments, workplace facilities and related controls.
Did you know
ROPS and FOPS
Roll-Over Protective Structures (ROPS) and Falling-Object Protective Structures (FOPS) on loaders are credited with drastically reducing fatalities and serious injuries in the event of a rollover or impact from falling materials.
Mobile Plant Incidents
According to Safe Work Australia, incidents involving vehicles, particularly mobile plant like loaders, consistently rank as a leading cause of workplace fatalities and serious injuries in Australia.
FAQ
Frequently asked questions
01What is the purpose of a loader pre-start checklist?
02How often should a loader pre-start check be completed?
03What happens if a defect is found during a pre-start check?
04Is this loader checklist template compliant with Australian WHS laws?
Share this resource
Free Pre-Start Checklist (Loader) Template
Browse Categories
How To Use It
- 1Download and open in Word or PDF.
- 2Replace the placeholders with your business details.
- 3Get it reviewed by a WHS specialist before rollout.
Need it customised?
Our WHS consultants can adapt this template to your site, run a gap analysis, or audit what you already have in place.
Book a Free Consultation Explore Consultancyor call 1300 156 382
